Knights Brown are contracted by Cummins Power Generation to design and build the civil infrastructure for short term operating reserve (STOR) sites across the UK.

These typically include the design and build of piling, reinforced concrete slab and plinths for the Genset units, reinforced concrete bunded transformer compound, gas supply, electricity ducts, site access road, drainage works, crane platforms and security fencing.

Some projects also include the construction of a portal frame building associated with these 20MW peak demand gas power stations.

our sectors

Knights Brown performed very well on this project in terms of quality, cost and time. The team worked very well as part of an integrated delivery team with the Employer to the benefit of the project

- Marc Bryan, Portsmouth City Council

Sites are always very well presented. First impressions count and if a site looks well organised and clean when you arrive then generally this is applied throughout the management of the projects. Indeed, all five projects I am Cummins PM for, have been managed to a high standard and equally the safety records and standards are very good.

- Iain Brooks, Cummins

Overall a successful project with good management of the work. Site team asked questions rather than made assumptions which was good. Good communication. Would (and have) recommended Knights Brown for other projects.

- Chris Clark, Colin Toms & Partners