We use our own and third party cookies to give you the best experience on the services we offer. To accept cookies continue browsing as normal or click Accept. For more information please check our Cookie Policy.




    *mandatory fields

    I confirm that the data submitted in this webform may be used by Knights Brown for answering my enquiry. It may be held on record for business purposes for a period of 12 months.I do not consent to Knights Brown holding my data for business purposes.

    Jermaine Perpetua, Graduate Civil Engineer

    Jermaine explains why she chose to start her career with Knights Brown and the experience she is gaining on site.

    Manbir Dhillon, YII Engineer

    Manbir explains his responsibilities and what he's gaining in experience on site a matter of weeks into his year in industry.

    Joseph Palmer, Section Engineer

    Joseph speaks about the progress he has made in his career in the two years since he joined us from university.

    Georgi Popadiyn, YII Engineer

    Georgie tells of his experiences with Knights Brown a few months into his year in industry placement.

    Joseph Tucker, Graduate Engineer

    Joseph answers some of the FAQs we get asked by students and graduates looking to start their careers.

    David Shillabeer, Graduate Engineer

    David talks about how he came to join Knights Brown and the experience he has gained to date as a graduate engineer.

    Inaugural Use of Berth 2 by Majesty of the Seas

    As our contract for the levelling and extension of berth 2 at Portsmouth International Port neared its conclusion, we were asked to accommodate the arrival of Royal Caribbean Cruises' Majesty of the Seas. At 268m she is the longest ship to have berthed at Portsmouth and was a fitting guest for the berth's first official use.

    Berth 2 Portsmouth International Port

    Knights Brown was responsible for the design and construction of the levelling and extension of berth 2 so that Portsmouth International Port could accommodate much larger ships (up to 255 metres in length). This time lapse video runs for about 9 minutes and covers the entire construction project.

    Non-tidal wet basin, Pendennis Shipyard

    Time lapse footage of the construction of the non-tidal wet basin we completed for Pendennis Shipyard in Falmouth.

    Completed Crowthorne Community Fire Station

    Construction of the new Crowthorne Community Fire Station has been completed and the facility opened for service on Sunday 3 May 2020.
    Crowthorne is Royal Berkshire’s second tri-service community fire station and provides a shared location for Royal Berkshire Fire and Rescue Service, Thames Valley Police and South Central Ambulance Service.

    Time Lapse from Avonmouth Fire Station

    The redevelopment of Avonmouth fire station comprises:
    - Demolition of the southern (single storey) building and bays 3-5 of the existing appliance bay and covered wash. Construction of the new accommodation block and single appliance bay.
    - Demolition of the northern (two storey) building and the remaining appliance bay. Construction of the remaining four appliance bays and all remaining externals works.

    Introduction to Knights Brown and our people

    We launched our first company video in September 2019 to coincide with the second anniversary of our rebranding.
    It features our people and showcases our projects and the diversity of our offering. It focuses on our key messages of putting our people first, delivering projects we are proud of, and achieving ambitions both for our people and our customers.
    We also think it shows just how far we've come over the past two years.

    Inauguration of Lulwo Footbridge, Bridges to Prosperity 2019

    Our fourth project with Bridges to Prosperity came to a successful conclusion in August 2019, when the 64m suspended Lulwo footbridge was opened. The community will now have year-round safe access to essential services including education, healthcare, and markets. Our team of volunteers had the most amazing experience. This video highlights the inauguration ceremony. There are others on our YouTube channel.

    CleanEarth Wind Turbine Installation for Accolade Wines

    Our customer, CleanEarth, made this film of the wind turbine's final assembly at Accolade Wine's HQ in Avonmouth over the weekend of 11/12 May 2019. After nearly three years in the planning, the last couple of days went without a hitch.
    Knights Brown constructed the reinforced concrete piled foundation. Great credit to all CleanEarth's partners: King Lifting, Vensys, Balfour Beatty Ground Engineering and JNP Group.

    Time Lapse Footage of the Demolition of Butts Bridge, Alton

    The demolition of this brick arch railway bridge in Alton makes way for its replacement with a steel structure that has been designed to minimise maintenance while reflecting the Victorian heritage of the original. These works will remove a local bottleneck and associated pinch points, creating a safer, more efficient junction and are part of a wider scheme to facilitate new housing that will meet the future needs of the area.

    North Portsea Island CFERM Phase 3 - Year 2 Works Now Complete

    The second year of works being carried out under phase three of the North Portsea Island Coastal Flood & Erosion Risk Management scheme, at Tipner Lake, is now complete and has been opened to the public. The construction of a 4m high, reinforced concrete seawall along the 1.85 km frontage of Tipner Lake. It will provide a continuous defence and protection against a 1 in 500 year coastal flood event. Year two of this three year project is coming to a conclusion.

    Jaguar Land Rover Aftercare Facility, Christchurch

    A new ‘aftercare’ building for the maintenance and servicing of Jaguar and Land Rover vehicles on one site. At 2,471m² this is the biggest facility of its type outside of JLR's global headquarters in Warwickshire.

    Milford on Sea Beach Huts

    Construction of 119 precast concrete beach huts at Milford on Sea, Hampshire, have been completed by Raymond Brown Construction.
    The original beach huts were destroyed in a huge storm on 14 February 2014.

    Bridges to Prosperity 2018 Inauguration ceremony

    Our team of volunteers in Uganda tackled our biggest ever in-country bridge build, the 92m Namakhokolo footbridge. This footage was shot during the inauguration ceremony, and shows what looks to be the entire community making a mass crossing. It certainly put its load-bearing credentials to the test.

    Bridges to Prosperity 2018 Teaching 'the Floss'

    This year our Bridges to Prosperity volunteers travelled to Uganda. While in country one of our volunteers took the opportunity to teach some of the local children how to 'Floss'. Bet you can't watch this without smiling. We grin every time.

    ICE South West Civil Engineering Awards 2018

    Our West Bay Deep Water Berth project was a finalist in this year's ICE South West Awards. This quirky, 15 minute film features our Project Manager, Nick Gibb as the ICE celebrates the achievements of civil engineers across the south west region.

    Floplast - Warehouse & External Storage Yard, Sittingbourne

    We have completed the construction of an extension to Floplast's existing factory facility in Sittingbourne, Kent. Floplast is, one of the UK's leading manufacturers and suppliers of plastic building and plumbing systems.

    Discover Civil Engineering (ICE)

    Our North Portsea Phase 3 project for Eastern Solent Coastal Partnership features in a new video from the ICE “Discover Civil Engineering”. It's a great short film designed to promote civil engineering to a new audience.

    Hill Head Coastal Protection Phase 2

    The construction of a 1500m long reinforced concrete sea wall incorporating access steps, ramp and a new promenade. The aim of this project was to develop, design and build a cost effective coastal defence solution to maintain amenity and leisure access along this frontage for the lifetime of the structure.

    Bridges to Prosperity 2017

    This summer, a team of 10 volunteers (five from Knights Brown and five from Tony Gee & Partners) travelled to Rwanda to build a 58m suspension bridge over the Bakokwe River at Budende, under our industry partnership programme with Bridges to Prosperity. This video follows their remarkable journey.

    North Portsea Island CFERM Phase 2

    We have completed phase 2 of the North Portsea Island CFERM project - - Milton Common and Salterns Quay. This footage is a compilation of all the previous videos we have previously published.

    River Ely Bridge Lift

    This footage shows the installation of a 40m span pre-fabricated warren truss bridge weighing approximately 29T. A 500T crane lifted the structure into position over A48 Western Avenue in Cardiff, which was closed overnight.

    Kingwood Stud Horse Training Facility

    Drone footage of our work on Kingwood Stud's unique Horse Training Facility in Lambourn.

    Newham Court Drive Maidstone

    Drone footage of new access road for Kent Medical Campus.

    Recycling of the Jetty Chalk

    Recycling of the chalk in Great Salterns Quay during the operation to remove it, part of our works to construct new coastal defences at Milton Common, Portsea.

    New coastal defences under construction at Portsea

    New coastal defences under construction at Milton Common, Portsea. This is phase two of the wider North Portsea Island Coastal Flood and Erosion Risk Management Scheme.

    Time lapse Watford Turbine Lift

    Time lapse footage of the lifting of the turbine at Watford Lodge Wind Farm.

    Household Waste Management Centre, Bridport

    Drone footage of the completed Household Waste Management Centre at Bridport completed for Dorset County Council/Dorset Waste Partnership.