    Gatwick Airport Limited

    Location

    Gatwick Airport, Sussex

    Value

    £0.1m

    Knights Brown was appointed for the design and construction of enabling works associated with the installation of interconnection cables between two substations, located off the main airport campus to the east of the railway, which would provide the airport with HV power resilience.

    The works comprised of the installation of just over 1km of 150mm diameter HDPE dual ducting through agricultural land and included a structure and a road crossing.

    our sectors

    Knights Brown performed very well on this project in terms of quality, cost and time. The team worked very well as part of an integrated delivery team with the Employer to the benefit of the project

    - Marc Bryan, Portsmouth City Council

    Site staff were pleased to have had Knights Brown on the team, they were proactive from day one to the end towards potential issues and responsive to a changing site environment for works.

    - David Sheldon, Cummins

    This complex and challenging project was a collaborative undertaking from the outset. Combining two projects was inspirational, saving not only money but diverting 22,000m3 from landfill. Some extremely innovative tools and methods were used to demolish the pier, recover material and to achieve the lowest environmental impact on one of the most environmentally designated places in the UK.

    - London and South East Constructing Excellence Awards judging panel on Phase 2 of the North Portsea Island CFERM