    Knight Brown was appointed to carry out the infrastructure works for the development of Forest Gate business park. As an old gas works site, it was subject to strict planning conditions in relation to ground remediation and sustainable drainage design principles. The scheme involved the construction of access roads, deep drainage, new services, kerbing and footpaths to service the new development.

    The initial drainage design was based on the principle of containment using 174m of box culverts, hydro-brake manholes and a pumping chamber. Through Early Contractor Involvement, our site management team redesigned the drainage using ovoid pipes, thereby reducing delivery periods and mitigating costs.

    The drainage was installed more than four metres deep, below the high water table. Pumping and dewatering was therefore, required into a lagoon to control the water levels. The trenches were lined with Visqueen GX hydrocarbon UDG protection membrane to protect the controlled waters from potential leachate contamination.

    During the development works, contaminated ground, not previously identified was discovered and dealt with in the original programme in accordance with the strict planning conditions.

    our sectors

    Sites are always very well presented. First impressions count and if a site looks well organised and clean when you arrive then generally this is applied throughout the management of the projects. Indeed, all five projects I am Cummins PM for, have been managed to a high standard and equally the safety records and standards are very good.

    - Iain Brooks, Cummins

    Knights Brown performed very well on this project in terms of quality, cost and time. The team worked very well as part of an integrated delivery team with the Employer to the benefit of the project

    - Marc Bryan, Portsmouth City Council

    Site staff were pleased to have had Knights Brown on the team, they were proactive from day one to the end towards potential issues and responsive to a changing site environment for works.

    - David Sheldon, Cummins