    Customer

    Engineered Systems (Electrical) Ltd

    Location

    Ffestiniog

    Value

    £0.8m

    Knights Brown was contracted to install a 2.7km long HV cable route between Ffestiniog Hydro Power Station and Stwlan Dam, in the stunning setting of Snowdonia National Park.

    The cable route increased in elevation by approximately 300m over its length, to reach the dam.

    The extreme nature of the location called for deliveries to be made by helicopter and some lateral thinking by our site team.

    our sectors

    This complex and challenging project was a collaborative undertaking from the outset. Combining two projects was inspirational, saving not only money but diverting 22,000m3 from landfill. Some extremely innovative tools and methods were used to demolish the pier, recover material and to achieve the lowest environmental impact on one of the most environmentally designated places in the UK.

    - London and South East Constructing Excellence Awards judging panel on Phase 2 of the North Portsea Island CFERM

    Sites are always very well presented. First impressions count and if a site looks well organised and clean when you arrive then generally this is applied throughout the management of the projects. Indeed, all five projects I am Cummins PM for, have been managed to a high standard and equally the safety records and standards are very good.

    - Iain Brooks, Cummins