We use our own and third party cookies to give you the best experience on the services we offer. To accept cookies continue browsing as normal or click Accept. For more information please check our Cookie Policy.




    *mandatory fields

    I confirm that the data submitted in this webform may be used by Knights Brown for answering my enquiry. It may be held on record for business purposes for a period of 12 months.I do not consent to Knights Brown holding my data for business purposes.


    Dukes Meadows Footbridge, a new pedestrian bridge in Chiswick, has opened. Designed by Moxon Architects together with structural engineers COWI, the bridge was constructed by Knights Brown and closely follows the concept and planning design prepared by Moxon with engineers CampbellReith. The new low-carbon footbridge – positioned beneath the existing Grade II listed Barnes Bridge – rejuvenates a previously disconnected stretch of the Thames Path, dramatically improving safety, access and pedestrian flow.

    As one of the projects in the Mayor of London’s £53 million Liveable Neighbourhoods scheme, the bridge is part of the London Borough of Hounslow’s drive to improve infrastructure, safety and leisure opportunities in the Dukes Meadows area. The new bridge links two sections of the Thames Path, with landscaped landings improving access to the nearby rowing clubs and sports grounds.

    As well as negating the need for pedestrians to make a 500m detour to negotiate the railway, the footbridge makes the Thames Path inclusive to more users, providing better-lit and safer access to wheelchairs, mobility scooters, and those with pushchairs. By enhancing the Thames Path, the new footbridge provides additional leisure options to the wider area, encouraging recreation and sustainable modes of travel. The bridge also responds to the high volume of rowing traffic along this section of the river, anticipating views to and from rowers at all tide levels.

    Utilising off-site prefabrication in Tilbury, Essex, as well as the river itself for the transportation and installation of the bridge sections, an overall aim has been to reduce environmental impacts and carbon emissions during construction. Energy efficient lighting was designed to protect the fragile ecosystem within Dukes Hollow. With robust finishes in stainless steel and aluminium, the structure anticipates future flooding and reduces the maintenance required over its expected 100+ year lifetime.

    The structure is a ‘half through’ truss form with distinctive bracing members angled to maximise oblique views to the river. Estimates using COWI’s CO2e tool show innovation in material specification and construction technique between design and completion have enabled a 50% reduction of carbon emissions associated with the trusses, and a 30% reduction in the footbridge’s overall carbon footprint.

    The meandering alignment of the trusses facilitates views up and downstream, as well as into the adjacent Dukes Hollow nature reserve – one of the few remaining natural tidal habitats in London. In addition to linking the Thames Path and providing access to the adjacent sports grounds and rowing clubs, the design also respects surrounding ecology by carefully integrating the structure into landscaped banks on either side of Barnes bridge. The open truss parapets that enable views from the bridge, also allow views through to the dense vegetation when seen from the Barnes side of the river. The 115m long structure is divided into four ambitiously slender spans that hug the shoreline, touching down on discrete piers that provide a minimal footprint within the tidal zone.

    The impact of the resulting footbridge will be felt far beyond the project’s boundaries as it enhances the already cherished Dukes Meadows.

    Ezra Groskin, Director, Moxon Architects, said: “Our intention was to develop an affordable, efficient and honest solution that was easy to construct and pleasing to use. With a modest and refined appearance, the bridge sits respectfully below the existing landmark structure, referencing its form without competing for attention.”

    The Leader of Hounslow Council, Councillor Shantanu Rajawat, said: “Pedestrians and cyclists using the Thames Path in Dukes Meadows usually find themselves facing a long detour that takes them away from the Thames to pass through a narrow tunnel under the railway. This bridge will now offer a fantastic uninterrupted route along the jewel in London’s crown: the River Thames. Along with being a magnificent engineering triumph, the bridge has also been designed to maximise views across the river and provide easy access for wheelchair, mobility scooter and pushchair users.”

    Cameron Archer-Jones, Principal Engineer, COWI in the UK, said: “With significant carbon emissions traceable to construction of transport infrastructure projects, COWI is committed to designing intelligently, specifying low-carbon materials, and building efficiently on every project – and the Dukes Meadow Footbridge was one of the very first projects to benefit from an innovative new tool developed by COWI to improve how carbon data is captured and utilised. Project data is inputted into the tool and a resulting figure based on functional area is produced. In the case of the Dukes Meadows Footbridge, the project’s carbon intensity was tracked at various stages through the refinement to study how carbon intensity reduced over time.”

    Sean Hebden, Divisional Director, Knights Brown said: “The innovation deployed to overcome the complexities of the build and installation process are an example to us all of what can be achieved when everybody works together. The quality of the end result is something we should all be proud of. We’re grateful for the fantastic support received from our extended supply chain and for the stunning design, which has been recreated to maximum effect in delivery. We hope it brings much pleasure to the council and community of Hounslow.”